Lyons
![20200626 final cam 02 the song jd](https://monograph.imgix.net/0be7bc37-a1c1-4e15-980f-b63e15cb4f93/20200626_final_cam-02_the_song_jd.jpg?q=50&h=151&fit=min)
![Closeup massing](https://monograph.imgix.net/8b567284-f01a-4ccd-b098-c50762341f47/closeup_massing.jpg?q=50&h=151&fit=min)
![013 edit](https://monograph.imgix.net/d361345f-38ce-49e2-ac4c-b1e41ea03869/013-edit.jpg?q=50&h=151&fit=min)
![Cornerview clean new marquee 01](https://monograph.imgix.net/0f6825a3-81e6-4c38-a07c-8262b3ae471f/cornerview_clean_new-marquee-01.jpg?q=50&h=151&fit=min)
![1315 v16 mezz with railing 10 21 2020](https://monograph.imgix.net/83634158-b3e3-4141-a6ea-8732cc8f0117/1315_v16-mezz-with-railing-10-21-2020.jpg?q=50&h=151&fit=min)
![20200626 final cam 03 friday night jd](https://monograph.imgix.net/1a20c522-f0de-41cf-9272-d908a9adfd7e/20200626_final_cam-03_friday-night_jd.jpg?q=50&h=151&fit=min)
![1315 v14ted](https://monograph.imgix.net/9dca5f06-6989-422d-8420-5d3d28cc3bc7/1315_v14ted.jpg?q=50&h=151&fit=min)
![1315 v14](https://monograph.imgix.net/98cd3d9b-6b5b-4463-9670-c24fac687256/1315_v14.jpg?q=50&h=151&fit=min)
![20200626 final cam 01 hands up jd](https://monograph.imgix.net/f8ceecec-82a4-463f-b2d1-5ef7a20f35a5/20200626_final_cam-01_hands-up_jd.jpg?q=50&h=151&fit=min)
![Dcpresentation1macy s skybridgeagendaid4737 page 05 image 0001](https://monograph.imgix.net/2a620dba-3416-4dd5-9e90-e952b39b9562/dcpresentation1macy-s-skybridgeagendaid4737_page_05_image_0001.jpg?q=50&h=151&fit=min)
The existing building was the Macy’s department store downtown Seattle, which made the National Register of Historic Places in 2016. After Macy’s closed in 2020, W.PA was hired to perform a testfit of the existing building turning the first two floors into a music venue.
Restorations were being considered for the windows, front entrance canopy, interior stairs, columns, and the historic ceiling. A cherished marquee from a historic local music venue was intended to be relocated to the site, which required significant structural considerations for the exterior masonry.
W.PA collaborated with local authorities to accommodate this 1,500 capacity venue within the downtown urban core, but ultimately due to code restrictions this project was unfinished.
LOCATION | Seattle, WA |
date | 2020 |
TOTAL SF | 800,000 |
capacity | 1,500 |
TYPOLOGY | Music Venue |
client | AEG |
STATUS | Schematic Design |
Team
Architect | Carrie Strickland, Brian Cavanaugh, Edward Cronin, Jared Diganci |